• WHO WE ARE
  • SHOP
  • WHAT WE DO
  • MEDIA
  • CONTACT
0 items د.إ0.00
Menu
FPGT General Trading LLC
0 items د.إ0.00
Click to enlarge
Home All Products Rain Shield of Module Door Station
Rain Shield of Module Door Station
Rain Shield of Module Door Station
Back to products
Gang Box
Gang Box
Hikvision

Rain Shield of Module Door Station

SKU: DS-KABD8003-RS3 Category: All Products Tags: Door, Rain Shield of Module, Station
Share:
  • Additional information
  • Description
Additional information
Brand

Hikvision

Customer Application

Airports

Customer Type

Airports

,

Army

,

Commercial

,

Government Entities

,

Healthcare

,

Industrial

,

Jail / Prison

,

Law Enforcement

,

Medical

,

Navy / Coastal Protection

,

Oil & Gas

,

Other Businesses

,

Private Entities

,

Security Firms

,

Space & Research

Description
  • Convenient design available for the 3 module surface mounting of the modular door station (DS-KD8003-IME1 or DS-KD8003-IME2)
  • Material: SECC

Available models:

  • DS-KABD8003-RS3

General

  • Working Temperature : -40° C to +60° C (-40° F to 140° F)
  • Working Humidity : 10% to 95%
  • Weight : 702.3g
  • Dimension (W × H × D) : 325.8x 116.4×58 mm (12.83″ x 4.58″ x 2.28″)
  • Installation :

    1. Paste the installation Sticker 1 onto the wall. Make sure the sticker is placed leveled via measuring with the gradienter.

    Drill 4 holes align to the screw holes on the sticker.

    The suggested size of hole is 6 (diameter) × 25 (depth) mm.

    2. Remove the sticker and insert the expansion sleeves into the screw holes.

    Fix the mounting frame and protective shield onto the wall with 4 expansion bolts.

    Thread the module-connecting lines across the thread holes of the frame.

    Pass the main unit connecting lines across the thread hole to the top grid.

    Connect the cables and module-connecting line 1 to the corresponding interfaces of the main unit, then place the main unit into the upper grid.

    Connect the other end of the module-connecting line1 to the input interface of the sub module. Connect two sub modules via module-connecting line 2.

    Organize the line with cable tie in the package.

    3. Insert the modules in to the frame after wiring. Main unit must be placed in the top grid.

    4. Use the hexagon wrench in the package fix the cover onto the frame.

  • Material : SECC

Fortress Protection Group Technologies –
Where Your Security is Our Priority.

  • USEFUL LINKS
    • About Us
    • Contact Us
    • Shop
    • Media
  • LEGAL
    • Privacy Policy
    • Terms & Conditions
  • Contact Us
    • Phone: 00971(0)569436363
    • Email: [email protected]
    • Address: Abu Dhabi | UAE
    • Website: www.fp-me.com
    • c/o: FPGT General Trading LLC
© 2024 Fortress Protection Group Technologies | DEVELOPED BY Babapinnak Media LLP.
Close
  • WHO WE ARE
  • SHOP
  • WHAT WE DO
    • SECURITY SYSTEMS
    • DETECTION & IDENTIFICATION SYSTEMS
    • INSPECTION SYSTEMS
    • ROBOTICS
    • ANALYTICAL SYSTEMS
    • WAREHOUSING
    • BATTERIES & POWER
    • APPLICATIONS
    • SERVICE AND SUPPORT
  • MEDIA
  • CONTACT
Shopping cart
Close
Shop
0 items Cart